{"id":24014,"date":"2019-12-10T06:08:57","date_gmt":"2019-12-10T06:08:57","guid":{"rendered":"https:\/\/www.proprofs.com\/c\/?p=24014"},"modified":"2026-05-21T22:04:48","modified_gmt":"2026-05-21T22:04:48","slug":"lean-project-management","status":"publish","type":"post","link":"https:\/\/www.proprofsproject.com\/blog\/lean-project-management\/","title":{"rendered":"What Is Lean Project Management? It&#8217;s Origin, Principles &#038; Benefits"},"content":{"rendered":"\n<p><span style=\"font-weight: 400;\">In many ways, project management is a recent craft; but one that has learned a lot from the world of old manufacturing processes. And project managers are constantly finding ways to implement the knowledge and experiences of 20th-century manufacturing to contemporary project management. With that in mind \u2013 lean project methodology is a great example!<\/span><\/p>\n\n\n\n<p><span style=\"font-weight: 400;\">Lean was born on the factory floor and that\u2019s why it is often referred to as a manufacturing technique or strategy. However, that\u2019s a bit incomprehensible because every process from service to production can benefit from a lean approach. That is the very reason why lean methodology is easily finding a home in almost every industry from banking to healthcare.<\/span><\/p>\n\n\n\n<p><span style=\"font-weight: 400;\">Taking a few pages out of the book of lean manufacturing, we\u2019ll have a look at what exactly is the lean methodology and lean project management. Following that, we\u2019ll also see the benefits of project management in the modern project-oriented workplace.<\/span><\/p>\n\n\n\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_17 counter-hierarchy ez-toc-grey\">\n<nav><ul class=\"ez-toc-list ez-toc-list-level-1\"><li class=\"ez-toc-page-1 ez-toc-heading-level-2\"><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/www.proprofsproject.com\/blog\/lean-project-management\/#About_Lean_Project_Management\" title=\"About Lean Project Management\">About Lean Project Management<\/a><\/li><li class=\"ez-toc-page-1 ez-toc-heading-level-2\"><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/www.proprofsproject.com\/blog\/lean-project-management\/#Origins_of_Lean_Management\" title=\"Origins of Lean Management\">Origins of Lean Management<\/a><\/li><li class=\"ez-toc-page-1 ez-toc-heading-level-2\"><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/www.proprofsproject.com\/blog\/lean-project-management\/#What_is_Lean_Methodology\" title=\"What is Lean Methodology?\">What is Lean Methodology?<\/a><ul class=\"ez-toc-list-level-3\"><li class=\"ez-toc-heading-level-3\"><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/www.proprofsproject.com\/blog\/lean-project-management\/#1_Deming_Cycle\" title=\"1. Deming Cycle\">1. Deming Cycle<\/a><\/li><li class=\"ez-toc-page-1 ez-toc-heading-level-3\"><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/www.proprofsproject.com\/blog\/lean-project-management\/#2_Kanban\" title=\"2. Kanban\">2. Kanban<\/a><\/li><\/ul><\/li><li class=\"ez-toc-page-1 ez-toc-heading-level-2\"><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/www.proprofsproject.com\/blog\/lean-project-management\/#Principles_of_Lean_Thinking\" title=\"Principles of Lean Thinking\">Principles of Lean Thinking<\/a><ul class=\"ez-toc-list-level-3\"><li class=\"ez-toc-heading-level-3\"><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/www.proprofsproject.com\/blog\/lean-project-management\/#1_Specified_Value\" title=\"1. Specified Value\">1. Specified Value<\/a><\/li><li class=\"ez-toc-page-1 ez-toc-heading-level-3\"><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/www.proprofsproject.com\/blog\/lean-project-management\/#2_Identifying_Product_Value_Streams\" title=\"2. Identifying Product Value Streams\">2. Identifying Product Value Streams<\/a><\/li><li class=\"ez-toc-page-1 ez-toc-heading-level-3\"><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/www.proprofsproject.com\/blog\/lean-project-management\/#3_Increasing_Value_Flow_Via_Waste_Elimination\" title=\"3. Increasing Value Flow Via Waste Elimination\">3. Increasing Value Flow Via Waste Elimination<\/a><\/li><li class=\"ez-toc-page-1 ez-toc-heading-level-3\"><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/www.proprofsproject.com\/blog\/lean-project-management\/#4_The_Client_Dictates_The_Flow\" title=\"4. The Client Dictates The Flow\">4. The Client Dictates The Flow<\/a><\/li><li class=\"ez-toc-page-1 ez-toc-heading-level-3\"><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/www.proprofsproject.com\/blog\/lean-project-management\/#5_Constantly_Strive_To_Improve\" title=\"5. Constantly Strive To Improve\">5. Constantly Strive To Improve<\/a><\/li><\/ul><\/li><li class=\"ez-toc-page-1 ez-toc-heading-level-2\"><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/www.proprofsproject.com\/blog\/lean-project-management\/#Lean_Project_Management_Benefits\" title=\"Lean Project Management Benefits\">Lean Project Management Benefits<\/a><\/li><li class=\"ez-toc-page-1 ez-toc-heading-level-2\"><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/www.proprofsproject.com\/blog\/lean-project-management\/#Lean_Project_Management_as_a_Solution\" title=\"Lean Project Management as a Solution\">Lean Project Management as a Solution<\/a><\/li><li class=\"ez-toc-page-1 ez-toc-heading-level-2\"><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/www.proprofsproject.com\/blog\/lean-project-management\/#Frequently_Asked_Questions\" title=\"Frequently Asked Questions&nbsp;\">Frequently Asked Questions&nbsp;<\/a><\/li><\/ul><\/nav><\/div>\n<h2><span class=\"ez-toc-section\" id=\"About_Lean_Project_Management\"><\/span><b>About Lean Project Management<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p><span style=\"font-weight: 400;\">Lean project management is a logical process used in manufacturing, that can be boiled down to two simple goals: minimizing waste while maximizing value. Indeed, using this methodology properly \u2013 in concert with modern project management software \u2013 ensures that there will be no waste to be found in your projects.&nbsp; At the same time, you can increase your profit margins while also achieving greater customer satisfaction!<\/span><\/p>\n\n\n\n<h2><span class=\"ez-toc-section\" id=\"Origins_of_Lean_Management\"><\/span><b>Origins of Lean Management<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p><span style=\"font-weight: 400;\">In order to understand the lean project management principles, one must first understand the origins of this <\/span><a href=\"https:\/\/www.proprofsproject.com\/blog\/project-management-methodologies\/\"><span style=\"font-weight: 400;\">project management methodology<\/span><\/a><span style=\"font-weight: 400;\">. With that in mind, we venture all the way back to 1973.<\/span><\/p>\n\n\n\n<p><span style=\"font-weight: 400;\">Many first-world c<\/span><span style=\"font-weight: 400;\">ountries were shocked by the sky-rocketing oil prices; which was the result of a political dispute between Arab countries and Israel. At this time, many manufacturing companies dependent on petroleum (and all of them were, to some degree) report significant losses; many of them being forced to shutter their doors.<\/span><\/p>\n\n\n\n<p><span style=\"font-weight: 400;\">One of the countries particularly vulnerable to the rising oil prices was Japan; thus, a huge number of their companies faced significant issues due to the sudden inflation of these expenses. However, there was one company that proved to be a significant exception \u2013 Toyota. And this wasn\u2019t a random fluke either.<\/span><\/p>\n\n\n\n<p><span style=\"font-weight: 400;\">The early-70s success of Toyota happened because of the long-standing principles of this company; the principles we recognize as lean management today.&nbsp;<\/span><\/p>\n\n\n\n<p><span style=\"font-weight: 400;\">At the end of WWII, the founders of <\/span><a href=\"https:\/\/www.lean.org\/WhatsLean\/History.cfm\"><i><span style=\"font-weight: 400;\">Toyota led the company<\/span><\/i><\/a><span style=\"font-weight: 400;\"> in accordance with the set of guidelines they dubbed the Toyota Production System. And this is basically the holy book of lean management.<\/span><\/p>\n\n\n\n<p><span style=\"font-weight: 400;\">These principles put the Toyota employees on a never-ending journey of improvement and inefficiency reduction in their work process. Thus, they were able to reduce the costs and lead-time in their manufacturing process, while also improving product quality and the satisfaction of their customers.&nbsp;<\/span><\/p>\n\n\n\n<p><span style=\"font-weight: 400;\">And thus, through the automobile industry, lean management was introduced into the western world of manufacturing theories. The waste elimination that Toyota managed was so undeniable, that it managed to lure all industries towards a lean management way of thinking; something that goes against pure mass production.<\/span><\/p>\n\n\n\n<h2><span class=\"ez-toc-section\" id=\"What_is_Lean_Methodology\"><\/span><b>What is Lean Methodology?<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p><span style=\"font-weight: 400;\">The lean methodology can be divided into three parts: Lean Six Sigma Project Management, Deming Cycle, and Kanban. Let\u2019s check out the three methodologies.<\/span><\/p>\n\n\n\n<p><span style=\"font-weight: 400;\">Lean Six Sigma is all about identifying the cause and reasons behind the problems in the project management process. This helps in the efficient use of resources and time. An acronym DMEDI is associated with Lean Six Sigma which refers to Define, Measure, Explore, Develop, and Implement.<\/span><\/p>\n\n\n\n<ul><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Define the goals of your project.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Determine the path to success and measure it at each milestone.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Explore how you can improve the project management process.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Develop a solid plan based on the project scope and deliverables.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Finally, launch and implement the project.<\/span><\/li><\/ul>\n\n\n\n<p><span style=\"font-weight: 400;\">To make this methodology work perfectly, <a href=\"https:\/\/www.proprofsproject.com\/blog\/best-project-management-software\/\">project management software<\/a> can help in different ways to analyze and monitor the project data and process. With the help of the right tools, PMs and teams can collect feedback at each stage to identify the points of improvement. Users can visualize the projects using Gantt charts and can streamline the project workflow by documenting everything at a centralized location.<\/span><\/p>\n\n\n\n<h3><span class=\"ez-toc-section\" id=\"1_Deming_Cycle\"><\/span><b>1. Deming Cycle<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p><span style=\"font-weight: 400;\">Deming Cycle is based on the philosophy of William Edwards Deming. It focuses on controlling and improving the project process continually. PCDA is followed here that refers to Plan, Do, Check, Act\/Adjust.<\/span><\/p>\n\n\n\n<ul><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">The <\/span><b>Planning<\/b><span style=\"font-weight: 400;\"> phase is about assessing the current project management processes and identifying the problematic areas.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">In the <\/span><b>Do<\/b><span style=\"font-weight: 400;\"> phase, PMs look for solutions.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">The <\/span><b>Check<\/b><span style=\"font-weight: 400;\"> phase is about gathering relevant information about the solutions and improving them.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Finally, implementation of the solution is done in the Act phase.<\/span><\/li><\/ul>\n\n\n\n<p><span style=\"font-weight: 400;\">This particular lean project management methodology works great on recurring projects.<\/span><\/p>\n\n\n\n<h3><span class=\"ez-toc-section\" id=\"2_Kanban\"><\/span><b>2. Kanban<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p><span style=\"font-weight: 400;\">A famous methodology that involves cards and boards, is based on visual signals to improve project management. With the help of Kanban, PMs can easily visualize the project progress, track the tasks &amp; due dates, and save a lot of time and cost.<\/span><\/p>\n\n\n\n<ul><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Visualize the project workflow.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Limit the work in progress and manage doable tasks.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Manage the flow of tasks according to priorities.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Implement feedback loops to get the tasks reviewed.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Collaborate with stakeholders for regular improvement.<\/span><\/li><\/ul>\n\n\n\n<p><span style=\"font-weight: 400;\">The organization of work requirements becomes easier with Kanban boards and PMs can identify the bottlenecks to take them up on priority.<\/span><\/p>\n\n\n\n<h2><span class=\"ez-toc-section\" id=\"Principles_of_Lean_Thinking\"><\/span><b>Principles of Lean Thinking<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p><span style=\"font-weight: 400;\">As the principles of <\/span><a href=\"https:\/\/en.wikipedia.org\/wiki\/Lean_thinking\"><i><span style=\"font-weight: 400;\">lean thinking<\/span><\/i><\/a><span style=\"font-weight: 400;\"> were slowly brought to the Western World, they also left the confines of pure manufacturing. By the middle of the 90s, the lean methodology would be applied to corporate management as well. A new set of best practices, tools, and management principles came into existence; that managed to improve the operational quality in corporate environments that weren\u2019t necessarily based on retail-oriented manufacturing.&nbsp;<\/span><\/p>\n\n\n\n<p><span style=\"font-weight: 400;\">In order for a project to be considered Lean, it must use the absolute minimum in terms of space, labor, equipment, and materials, to produce the best possible results. Below, we\u2019ll explore the core principles of this philosophy.<\/span><\/p>\n\n\n\n<h3><span class=\"ez-toc-section\" id=\"1_Specified_Value\"><\/span><b>1. Specified Value<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p><span style=\"font-weight: 400;\">The most important lean principle is value specification. In other words, each service or product must have a defined and clear value; one that depends on its capability to satisfy a client at the adequate price and at the right time \u2013 both of which are defined by them. Yes, the value is in the eyes of the customer and what they expect from you. And extracting the best possible price for the value of the product is what this principle focuses on.<\/span><\/p>\n\n\n\n<h3><span class=\"ez-toc-section\" id=\"2_Identifying_Product_Value_Streams\"><\/span><b>2. Identifying Product Value Streams<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p><span style=\"font-weight: 400;\">So, what is a value stream? In terms of lean management, this is the sum of every action that is currently needed to bring a product to market; from the state of raw materials to the finished product, or from a concept to the launch. The first practical thing that lean project management does is to make a map of the value stream, analyzing the worth of each step in the current process. Then, the PM proceeds to spot waste creation and produces a future-state map; one that depicts what the process should look like. After that, a plan for improvement is generated, enabling the transition from the existing plan to the one depicted in the future state.&nbsp;<\/span><\/p>\n\n\n\n<h3><span class=\"ez-toc-section\" id=\"3_Increasing_Value_Flow_Via_Waste_Elimination\"><\/span><b>3. Increasing Value Flow Via Waste Elimination<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p><span style=\"font-weight: 400;\">Once you have produced the value stream map and defined the value of the product, this step includes the insurance of a continuous flow; one that has no interruptions, reworks, scraps or backflows. Having no waste and no stoppages is the most important criteria here. While analyzing value streams, all work can generally be categorized into three types:<\/span><\/p>\n\n\n\n<ul><li style=\"font-weight: 400;\"><b><i>Value-Added Work<\/i><\/b><span style=\"font-weight: 400;\"> \u2013 These actions are deemed essential to the service or product. This is the category that brings the most customer value.<\/span><\/li><li style=\"font-weight: 400;\"><b><i>Value-Enabling Work<\/i><\/b><span style=\"font-weight: 400;\"> \u2013 This part of the flow represents actions that may be cut in the future, but cannot be eliminated in the given moment. Essentially, these are actions that are required to make the process run in its current state. Culture, environment, and technology dictate these activities.&nbsp;<\/span><\/li><li style=\"font-weight: 400;\"><b><i>Non-Value Work<\/i><\/b><span style=\"font-weight: 400;\"> \u2013 This is the type of action that can generally be eliminated without disrupting the workflow too much and doesn\u2019t depend on the changing of different areas. Basically, the type of work nobody actually needs, representing complete waste. This should be eliminated on identification.&nbsp;<\/span><\/li><\/ul>\n\n\n\n<p><b>Types of Waste&nbsp;<\/b><\/p>\n\n\n\n<p><span style=\"font-weight: 400;\">Generally, we can categorize all of the above-mentioned non-value work into these types:<\/span><\/p>\n\n\n\n<ul><li style=\"font-weight: 400;\"><b><i>Overproduction<\/i><\/b><span style=\"font-weight: 400;\"> \u2013 Producing a larger amount of anything than it is needed at the given time.<\/span><\/li><li style=\"font-weight: 400;\"><b><i>Waiting <\/i><\/b><span style=\"font-weight: 400;\">\u2013 Time spent waiting for resources and approvals, etc.<\/span><\/li><li style=\"font-weight: 400;\"><b><i>Transportation <\/i><\/b><span style=\"font-weight: 400;\">&#8211; Time wasted in the process of transporting or delivering finished goods, parts, or materials at the end of each milestone.<\/span><\/li><li style=\"font-weight: 400;\"><b><i>Inventory <\/i><\/b><span style=\"font-weight: 400;\">&#8211; Keeping a lot of resources occupied in advance even when they\u2019re currently not required.<\/span><\/li><li style=\"font-weight: 400;\"><b><i>Defects <\/i><\/b><span style=\"font-weight: 400;\">&#8211; Parts of the process that have to be reworked or repaired.<\/span><\/li><\/ul>\n\n\n\n<p><span style=\"font-weight: 400;\">All these areas should be identified at the earliest and PMs should design the workflow by eliminating this non-value work.<\/span><\/p>\n\n\n\n<h3><span class=\"ez-toc-section\" id=\"4_The_Client_Dictates_The_Flow\"><\/span><b>4. The Client Dictates The Flow<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p><span style=\"font-weight: 400;\">The trick here is not delivering any value before your client actually wants it. And you definitely must not give your customers more than you initially agreed to, in terms of scope. It is achieved using the Kanban system. As discussed earlier, the Kanban system is all about boards and cards to visualize the progress of the project. PMs can manage the resources, check the status of tasks, and clients can provide feedback or approvals quickly.<\/span><\/p>\n\n\n\n<h3><span class=\"ez-toc-section\" id=\"5_Constantly_Strive_To_Improve\"><\/span><b>5. Constantly Strive To Improve<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p><span style=\"font-weight: 400;\">Finally, the last step entails the constant pursuit of perfection, leading to a long-term transformation of the team into a lean culture mindset. And seeing as true perfection is unattainable, in reality this means constant process improvement. Every team member must question the merit and value of each activity in the production process to improve.&nbsp;<\/span><\/p>\n\n\n\n<h2><span class=\"ez-toc-section\" id=\"Lean_Project_Management_Benefits\"><\/span><b>Lean Project Management Benefits<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p><span style=\"font-weight: 400;\">The increasing popularity of the <a href=\"https:\/\/bau-master.com\/gb\/baublog\/lean-principles\/\" target=\"_blank\" rel=\"noreferrer noopener\">Lean principles<\/a> is due to their core values that focus on improving every aspect of the workflow and involve all stakeholders. The major benefits of project management are:<\/span><\/p>\n\n\n\n<ul><li style=\"font-weight: 400;\"><b><i>Increased Efficiency &amp; Productivity<\/i><\/b><span style=\"font-weight: 400;\">: When team members are on the right track to deliver value, their focus is on being productive as there are no distractions or unclear requirements.<\/span><\/li><li style=\"font-weight: 400;\"><b><i>Focus<\/i><\/b><span style=\"font-weight: 400;\">: With Lean methodology controlling the show, waste reduction is the key. The workforce will be focused on tasks and activities that bring value to the organization and meet the expectations of the client.<\/span><\/li><li style=\"font-weight: 400;\"><b><i>Smart Process (Pull System)<\/i><\/b><span style=\"font-weight: 400;\">: By implementing the pull system, the team needs to deliver work only if there is an actual demand. All the unnecessary work and tasks are eliminated this way.<\/span><\/li><li style=\"font-weight: 400;\"><b><i>Better Use of Resources<\/i><\/b><span style=\"font-weight: 400;\">: As the production is based on demand and accurate requirements, PMs can use resources and allocate tasks to the team members in a more efficient way.<\/span><\/li><li style=\"font-weight: 400;\"><b><i>Higher Profit<\/i><\/b><span style=\"font-weight: 400;\">: Time is money and if we are wasting time, it\u2019s a waste of money. As the lean methodology is about managing time efficiently, PMs can meet the client\u2019s requirements faster which is very profitable.<\/span><\/li><\/ul>\n\n\n\n<h2><span class=\"ez-toc-section\" id=\"Lean_Project_Management_as_a_Solution\"><\/span><b>Lean Project Management as a Solution<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p><span style=\"font-weight: 400;\">Let\u2019s face it \u2013 time and money are extremely important for everyone in their everyday lives. But when it comes to manufacturing and project management; they become absolutely critical. These are two basic resources that managers have to keep in mind as they work on bringing their<\/span><a href=\"https:\/\/www.proprofsproject.com\/blog\/keys-to-success-in-project-management\/\"><span style=\"font-weight: 400;\"> project to a successful conclusion<\/span><\/a><span style=\"font-weight: 400;\">. But how do you bring a hazy schedule and a shifty budget in line?<\/span><\/p>\n\n\n\n<p><span style=\"font-weight: 400;\">For many people, projects, and companies \u2013 lean project management was definitely the answer. A lot of studies, surveys, and conference reports suggest that about half of projects everywhere are over budget and\/or behind schedule. Naturally, lean program management isn\u2019t a magic spell that will solve all of this overnight. However, it does provide the structure needed for a disciplined approach, allowing a careful examination of each activity in the overall project lifecycle.<\/span><\/p>\n\n\n\n<p><span style=\"font-weight: 400;\">Many project managers from across the globe have earned the Lean Project Management certification to enhance their management skills. The certification mainly focuses on the waste reduction principles of Lean and the main objective is to ensure maximum project value. There are various institutions offering this certification and PMs can definitely boost their skillset.<\/span><\/p>\n\n\n\n<p><span style=\"font-weight: 400;\">To further help out in managing the projects efficiently, a Lean Project Management Software can do wonders. PMs can easily plan work and design the workflow. With the help of Kanban boards, they can track the progress of tasks, reallocate resources, and leave feedback. There are multiple options for reporting and analytics to analyze and identify the bottlenecks. Team members can work together in a collaborative environment to finish the project on time and within budget.<\/span><\/p>\n\n\n\n<h2><span class=\"ez-toc-section\" id=\"Frequently_Asked_Questions\"><\/span><b>Frequently Asked Questions&nbsp;<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<hr class=\"wp-block-separator\"\/>\n\n\n\n<p><b>Q. What is the lean method?&nbsp;<\/b><\/p>\n\n\n\n<p><span style=\"font-weight: 400;\">The lean method is the key factor as long as project management is concerned because it ameliorates processes and dwindles the wastage of time and resources. Basically, the lean method improves the odds of project success. With the help of it, project managers can achieve the best possible results with minimal use of available resources.&nbsp;<\/span><\/p>\n\n\n\n<p><b>Q. How do you apply lean to a project?<\/b><\/p>\n\n\n\n<p><span style=\"font-weight: 400;\">If you take a look at any given project and want to apply lean management methodology to it \u2013 you start by making a clear overview of every step currently found in the process. Then, you individually evaluate these steps in accordance with the lean management principles. Once you\u2019ve deduced which steps in the process need to be altered, cut, or retained; you can start implementing such changes. After that, you\u2019ll be left with a project with no excess steps or resource drains \u2013 a truly lean one.&nbsp;<\/span><\/p>\n\n\n\n<p><b>Q. How many lean principles are there?<\/b><\/p>\n\n\n\n<p><span style=\"font-weight: 400;\">There are five principles of lean management, each describing how one would go about introducing lean management principles in any project or work environment. While these principles were first intended to be used in manufacturing, they found their way into project management methodology as well.&nbsp;<\/span><\/p>\n\n\n\n<p><b>Q.&nbsp;What is a good example of lean thinking?<\/b><\/p>\n\n\n\n<p><span style=\"font-weight: 400;\">Apart from Toyota which we\u2019ve mentioned above, Intel was one of the first big companies to implement lean management principles in their production process. Seeing as they were always a giant in computer processor manufacturing, they needed to provide the market with a zero-bug product. And lean thinking allowed them to increase the quality of their products while simultaneously reducing the time to market from three months to just ten days.&nbsp;<\/span><\/p>\n\n\n\n<p><b>Q.&nbsp;Why do companies implement lean?<\/b><\/p>\n\n\n\n<p><span style=\"font-weight: 400;\">Companies all over the world implement lean management systems because these allow them to improve; both in terms of fiscal responsibility and in terms of product quality. Lean thinking gives corporations the opportunity to increase customer satisfaction while also cutting costs.&nbsp;<\/span><\/p>\n\n\n\n<p><span style=\"font-weight: 400;\">This kind of project management isn\u2019t just good for one specific product; if implemented over a longer period of time, it changes the corporate culture \u2013 steering it toward a constant need for improvement and extreme efficiency.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>In many ways, project management is a recent craft; but one that has learned a lot from the world of old manufacturing processes. And project managers are constantly finding ways to implement the knowledge and experiences of 20th-century manufacturing to contemporary project management. With that in mind \u2013 lean project methodology is a great example!&#8230;<\/p>\n","protected":false},"author":2,"featured_media":38596,"comment_status":"open","ping_status":"open","sticky":true,"template":"","format":"standard","meta":[],"categories":[19],"tags":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v16.7 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Ultimate Guide to Lean Project Management<\/title>\n<meta name=\"description\" content=\"Lean project management is an approach to maximize the project\u2019s progress and slash the wastage of time and resources using lean manufacturing principles.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.proprofsproject.com\/blog\/lean-project-management\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ultimate Guide to Lean Project Management\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.proprofsproject.com\/blog\/lean-project-management\/\" \/>\n<meta property=\"og:site_name\" content=\"ProProfs Project Blog\" \/>\n<meta property=\"article:published_time\" content=\"2019-12-10T06:08:57+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-21T22:04:48+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.proprofsproject.com\/blog\/wp-content\/uploads\/2019\/12\/What-is-lean-project-management-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"758\" \/>\n\t<meta property=\"og:image:height\" content=\"335\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"David Miller\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minutes\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Ultimate Guide to Lean Project Management","description":"Lean project management is an approach to maximize the project\u2019s progress and slash the wastage of time and resources using lean manufacturing principles.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.proprofsproject.com\/blog\/lean-project-management\/","og_locale":"en_US","og_type":"article","og_title":"Ultimate Guide to Lean Project Management","og_url":"https:\/\/www.proprofsproject.com\/blog\/lean-project-management\/","og_site_name":"ProProfs Project Blog","article_published_time":"2019-12-10T06:08:57+00:00","article_modified_time":"2026-05-21T22:04:48+00:00","og_image":[{"width":758,"height":335,"url":"https:\/\/www.proprofsproject.com\/blog\/wp-content\/uploads\/2019\/12\/What-is-lean-project-management-1.png","path":"\/var\/www\/web1\/user\/web1_proprofsproject\/web\/blog\/wp-content\/uploads\/2019\/12\/What-is-lean-project-management-1.png","size":"full","id":38596,"alt":"","pixels":253930,"type":"image\/png"}],"twitter_card":"summary_large_image","twitter_misc":{"Written by":"David Miller","Est. reading time":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebSite","@id":"https:\/\/www.proprofsproject.com\/blog\/#website","url":"https:\/\/www.proprofsproject.com\/blog\/","name":"ProProfs Project Blog","description":"ProProfs Project","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.proprofsproject.com\/blog\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"ImageObject","@id":"https:\/\/www.proprofsproject.com\/blog\/lean-project-management\/#primaryimage","inLanguage":"en-US","url":"https:\/\/www.proprofsproject.com\/blog\/wp-content\/uploads\/2019\/12\/What-is-lean-project-management-1.png","contentUrl":"https:\/\/www.proprofsproject.com\/blog\/wp-content\/uploads\/2019\/12\/What-is-lean-project-management-1.png","width":758,"height":335},{"@type":"WebPage","@id":"https:\/\/www.proprofsproject.com\/blog\/lean-project-management\/#webpage","url":"https:\/\/www.proprofsproject.com\/blog\/lean-project-management\/","name":"Ultimate Guide to Lean Project Management","isPartOf":{"@id":"https:\/\/www.proprofsproject.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.proprofsproject.com\/blog\/lean-project-management\/#primaryimage"},"datePublished":"2019-12-10T06:08:57+00:00","dateModified":"2026-05-21T22:04:48+00:00","author":{"@id":"https:\/\/www.proprofsproject.com\/blog\/#\/schema\/person\/d7e40aa7f7c752e6b56e13837eae4bbe"},"description":"Lean project management is an approach to maximize the project\u2019s progress and slash the wastage of time and resources using lean manufacturing principles.","breadcrumb":{"@id":"https:\/\/www.proprofsproject.com\/blog\/lean-project-management\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.proprofsproject.com\/blog\/lean-project-management\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.proprofsproject.com\/blog\/lean-project-management\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.proprofsproject.com\/blog\/"},{"@type":"ListItem","position":2,"name":"What Is Lean Project Management? It&#8217;s Origin, Principles &#038; Benefits"}]},{"@type":"Person","@id":"https:\/\/www.proprofsproject.com\/blog\/#\/schema\/person\/d7e40aa7f7c752e6b56e13837eae4bbe","name":"David Miller","image":{"@type":"ImageObject","@id":"https:\/\/www.proprofsproject.com\/blog\/#personlogo","inLanguage":"en-US","url":"https:\/\/secure.gravatar.com\/avatar\/dae1a2b22ca946c7335bba9b6f7b532a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/dae1a2b22ca946c7335bba9b6f7b532a?s=96&d=mm&r=g","caption":"David Miller"},"description":"David Miller, an Expert Writer at ProProfs, has over 12 years of experience as a consultant and business strategist. His narratives on project management, leadership, and personal development are featured on platforms like Jeff Bullas, HR.com, and eLearningIndustry. David mentors &amp; contributes innovative insights to ProProfs\u2019 blogs. Connect with him on LinkedIn.","url":"https:\/\/www.proprofsproject.com\/blog\/author\/david-miller\/"}]}},"_links":{"self":[{"href":"https:\/\/www.proprofsproject.com\/blog\/wp-json\/wp\/v2\/posts\/24014"}],"collection":[{"href":"https:\/\/www.proprofsproject.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.proprofsproject.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.proprofsproject.com\/blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.proprofsproject.com\/blog\/wp-json\/wp\/v2\/comments?post=24014"}],"version-history":[{"count":9,"href":"https:\/\/www.proprofsproject.com\/blog\/wp-json\/wp\/v2\/posts\/24014\/revisions"}],"predecessor-version":[{"id":49527,"href":"https:\/\/www.proprofsproject.com\/blog\/wp-json\/wp\/v2\/posts\/24014\/revisions\/49527"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.proprofsproject.com\/blog\/wp-json\/wp\/v2\/media\/38596"}],"wp:attachment":[{"href":"https:\/\/www.proprofsproject.com\/blog\/wp-json\/wp\/v2\/media?parent=24014"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.proprofsproject.com\/blog\/wp-json\/wp\/v2\/categories?post=24014"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.proprofsproject.com\/blog\/wp-json\/wp\/v2\/tags?post=24014"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}